Senarai Lokasi Saringan Komuniti COVID-19
Home
Selangor 2025
Inisiatif
Suara SAYA
GOMBAK
Pasukan Amir
Media
Suara Anda
LIHAT Maklumat PKPBD
Belanjawan Selangor 2020
LAYARI LAMAN RASMI BELANJAWAN
INISIATIF
BERNAMA: COVID-19 TEST RESULTS NO LONGER NEED TO BE UPLOADED TO MYSEJAHTERA - MOH
17/7/2024
The latest COVID-19 Management Guidelines can be accessed at https://covid-19.moh.gov.my/garis-panduan/garis-panduan-kkm.
Melawat Bazar Ramadan Kampung Laksamana.
23/3/2025
Melawat Bazar Ramadan Kampung Laksamana.
Menunaikan kewajipan membayar zakat di Masjid An-Nur
23/3/2025
Di Gombak tadi, saya berkesempatan menunaikan kewajipan membayar zakat di Masjid An-Nur
Solat Asar berjemaah bersama kariah Masjid An-Nur di Kampung Wira Damai.
23/3/2025
Alhamdulillah, menunaikan solat Asar berjemaah bersama kariah Masjid An-Nur di Kampung Wira Damai.
Majlis Perasmian Gudang Makanan Selangor (GMS) di Pelabuhan Klang.
23/3/2025
Majlis Perasmian Gudang Makanan Selangor (GMS) di Pelabuhan Klang.
Melancarkan Gudang Makanan Selangor (GMS) yang terletak di Pelabuhan Klang
23/3/2025
Alhamdulillah, Kerajaan Negeri Selangor hari ini melancarkan Gudang Makanan Selangor (GMS) yang terletak di Pelabuhan Klang
Seterusnya
1 / 612
NASIONAL
Malay Mail: Selangor Health Dept says managing MAEPS quarantine centre more challenging with rise in cases, vows to improve process
Syed Mohamed Arif said that he was at the CAC from 8.30am till 5.30pm, and was ferried to MAEPS in a cramped bus.
Malay Mail: MITI clarifies no police permit required to cross borders for work during MCO
The ministry also assured that the police and the National Security Council have been notified of the matter.
The Sun Daily: Latest SOPs for Selangor mosques, surau
For surau permitted to hold congregational prayers, only 50 people are allowed for Friday and obligatory prayers, while 50 male congregants are allowed for tarawih prayers.
Astro AWANI: PKP Selangor, KL: Waktu operasi rel dan bas Prasarana seperti biasa
Ketua Pegawai Operasi Transit Aliran Ringan (LRT), Azmi Mohd Zain berkata perkhidmatan sistem LRT, Transit Aliran Massa (MRT) dan monorel akan beroperasi seperti jadual sedia ada.
Selangor Kini: Nisbah populasi, kepadatan penduduk tentukan kadar jangkitan Covid-19
“Kami mengakui angka kes di negeri ini tinggi. Apa pun sifat penyakit berjangkit, ia berkait dengan populasi, kepadatan penduduk."
The Sun Daily: All schools in Selangor to close from tomorrow — MB (Updated)
Amirudin also said that with the implementation of the MCO, Ramadan bazaar operation in all the six districts involved would no longer be allowed starting this Saturday (May 8).
NST: Inter-district travel allowed for parents in Selangor until Friday to send, pick up children from school
The decision, he said, was made following a proposal by the state government, a report by the Hotspot Identification for Dynamic Engagement (HIDE) and on advice by the Health Ministry due to a spike in Covid-19 cases.
Sebelum
Seterusnya
DALAM BERITA
Selangor Journal: Selangor prepares swift response to potential new wave of Covid-19 -Exco
On Sunday, Health Minister Datuk Seri Dr Dzulkefly Ahmad said the Health Ministry is closely tracking the trajectory of the recent wave of a two-fold increase in Covid-19 cases reported by Singapore.
Astro Awani: Selangor tetapkan capaian 5G di kawasan industri cecah 80 peratus tahun ini
Amirudin berkata beliau tidak hanya melihat kepada peningkatan angka atau peratusan liputan semata-mata semasa pembentangan kelak, sebaliknya lebih menjurus kepada kualiti liputan atau kesalinghubungan rangkaian 5G bagi tujuan perindustrian kawasan terbabit.
Sebelum
Seterusnya
LAIN-LAIN
Sinar Harian: Selangor kesan aktiviti pembakaran secara haram di Kuala Langat
Ujar Jamaliah, semakan mendapati terdapat pelanggaran syarat oleh pemilik tanah yang menjadikan tanah pertanian sebagai tempat mengumpul atau melupus sampah secara haram.
Sinar Harian: KPS Berhad barakan pembangunan bola sepak Selangor
Malay Mail: Loke: Bandar Utama-Johan Setia LRT3 line 96pc complete, set to operate in 2025’s third quarter
This will be followed by system integration work, which is expected to take several months until early next year, he told reporters after inspecting the LRT3 project at the Pasar Jawa Station here today.
Sebelum
Seterusnya
#KITASELANGOR
Daftar hari ini untuk dapatkan maklumat terkini terus ke e-mel anda
Nama
Alamat Email
Terima kasih!
Anda telah didaftarkan untuk menerima makluman dan maklumat terkini.
Maaf! Ada ralat.