Senarai Lokasi Saringan Komuniti COVID-19
Home
Selangor 2025
Inisiatif
Suara SAYA
GOMBAK
Pasukan Amir
Media
Suara Anda
LIHAT Maklumat PKPBD
Belanjawan Selangor 2020
LAYARI LAMAN RASMI BELANJAWAN
INISIATIF
BERNAMA: COVID-19 TEST RESULTS NO LONGER NEED TO BE UPLOADED TO MYSEJAHTERA - MOH
17/7/2024
The latest COVID-19 Management Guidelines can be accessed at https://covid-19.moh.gov.my/garis-panduan/garis-panduan-kkm.
Episod 15, 30 Hari 30 Ayat
16/3/2025
Surah Al-Mulk, Ayat 22-24
Majlis Berbuka Puasa Bersama Rakyat serta Penyampaian Sumbangan Hari Raya 1446H di Masjid Tengku Ampuan Jemaah, Bukit Jelutong.
16/3/2025
Majlis Berbuka Puasa Bersama Rakyat serta Penyampaian Sumbangan Hari Raya 1446H di Masjid Tengku Ampuan Jemaah, Bukit Jelutong.
Menunaikan Solat Jumaat di Masjid As-Sharif Simpang 3, Gombak Setia
14/3/2025
Jumaat kedua dalam bulan Ramadan ini, saya ambil kesempatan untuk menunaikan Solat Jumaat di Masjid As-Sharif Simpang 3, Gombak Setia.
Episode 13, 30 Hari 30 Ayat
14/3/2025
Dalam episod kali ini, kita akan menghayati peringatan Allah tentang kekuasaan-Nya serta bagaimana kita perlu sentiasa bersyukur dan bertakwa dalam mencari rezeki.
Majlis Buka Puasa YAB Perdana Menteri Bersama Pemimpin Masyarakat Tempatan Negeri Selangor.
14/3/2025
Majlis Buka Puasa YAB Perdana Menteri Bersama Pemimpin Masyarakat Tempatan Negeri Selangor.
Seterusnya
1 / 602
NASIONAL
Malay Mail: Selangor exco: RM220m bridge linking Selangor, Perak will be completed by May 2025
Selangor Infrastructure and Agriculture Committee chairman Izham Hashim said the project would create a road network connecting Selangor and Perak and the quotation would be issued from January 2022.
Malay Mail: Schools in KL, Selangor, Putrajaya, Melaka under Phase Four of NRP to resume classes Nov 1
According to MoE, for states under Phase Three of the PPN, it will involve the presence of preschool students and those with special needs (MBK) in Sekolah Kebangsaan Pendidikan Khas, Sekolah Menengah Kebangsaan Pendidikan Khas, Sekolah Menengah Pendidikan Khas Vokasional and Program Pendidikan Khas Integrasi.
Malay Mail: KTMB adds ETS, KTM Intercity train services for interstate travellers
“The ETS service will be operational with 12 trips daily compared to only two now. The route covers the sectors of Gemas-Padang Besar, KL Sentral-Ipoh, Gemas-Butterworth and vice versa."
The Sun Daily: COVID-19 situation improving, Malaysia ready to enter endemic phase — Health DG (Updated)
He said a total of 778 ICU cases were recorded in the 40th epidemiology week, dropping by nine per cent compared to the 39th week, while 331 cases requiring respiratory aid in the 40th week registered an 11.2 percent drop compared to the number of cases recorded in the 39th week.
Berita Harian: Boleh ambil vaksin di klinik swasta, kerajaan
BH sebelum ini menyatakan sehingga kini terdapat 5.2 peratus individu belum divaksin. Peratusan berkenaan membabitkan kira-kira 1.224 juta penduduk dewasa di seluruh negara.
NST: No more blanket MCO, says PM
For now, he said there were more than 180 SOP being enforced to curb and prevent the spread of the virus.
The Sun Daily: Tourism bubble: Employers must conduct Covid-19 screening on workers — MATA
“The self-screening test can be done at least once a week to curb Covid-19 transmission at their premises. This also applies to other tour operators who are directly involved in the tourism bubble programme."
Sebelum
Seterusnya
DALAM BERITA
The Malaysian Reserve: Selangor International Expo Medic 2023 aims RM40m in transaction
It brings together medical industry players from around the world to facilitate business development, networking and knowledge exchange
Selangor Kini: PKPS, Segi Fresh meterai MoU perluas jualan murah di Selangor
Mengulas sama ada JER masih dianjurkan berikutan barangan Ehsan boleh didapati di Segi Fresh, beliau berkata setakat ini JER berlangsung seperti biasa.
Sebelum
Seterusnya
LAIN-LAIN
Astro Awani: DUN Selangor lulus usul kecam keganasan terhadap atlet, gesa siasatan menyeluruh
Beliau berkata tindakan ekstrem itu boleh membantutkan usaha negeri melahirkan lebih ramai atlet yang berwibawa di Malaysia.
NST: 65 pct of high impact projects under Selangor First Plan in implementation stage
Estimated to be fully completed by 2029, construction of the KSSA project is divided into three phases, with phase one involving the building of a new main stadium, an outdoor sports area, a parking plaza, and an integrated transportation terminal.
Malay Mail: Selangor FC Solidarity Fund raises over RM70,000 to cover MFL fine
Amirudin also thanked all contributors, particularly football fans and state assemblymen, for their generosity in donating to the Red Giants.
Sebelum
Seterusnya
#KITASELANGOR
Daftar hari ini untuk dapatkan maklumat terkini terus ke e-mel anda
Nama
Alamat Email
Terima kasih!
Anda telah didaftarkan untuk menerima makluman dan maklumat terkini.
Maaf! Ada ralat.