Senarai Lokasi Saringan Komuniti COVID-19
Home
Selangor 2025
Inisiatif
Suara SAYA
GOMBAK
Pasukan Amir
Media
Suara Anda
LIHAT Maklumat PKPBD
Belanjawan Selangor 2020
LAYARI LAMAN RASMI BELANJAWAN
INISIATIF
BERNAMA: COVID-19 TEST RESULTS NO LONGER NEED TO BE UPLOADED TO MYSEJAHTERA - MOH
17/7/2024
The latest COVID-19 Management Guidelines can be accessed at https://covid-19.moh.gov.my/garis-panduan/garis-panduan-kkm.
Melawat Bazar Ramadan Kampung Laksamana.
23/3/2025
Melawat Bazar Ramadan Kampung Laksamana.
Menunaikan kewajipan membayar zakat di Masjid An-Nur
23/3/2025
Di Gombak tadi, saya berkesempatan menunaikan kewajipan membayar zakat di Masjid An-Nur
Solat Asar berjemaah bersama kariah Masjid An-Nur di Kampung Wira Damai.
23/3/2025
Alhamdulillah, menunaikan solat Asar berjemaah bersama kariah Masjid An-Nur di Kampung Wira Damai.
Majlis Perasmian Gudang Makanan Selangor (GMS) di Pelabuhan Klang.
23/3/2025
Majlis Perasmian Gudang Makanan Selangor (GMS) di Pelabuhan Klang.
Melancarkan Gudang Makanan Selangor (GMS) yang terletak di Pelabuhan Klang
23/3/2025
Alhamdulillah, Kerajaan Negeri Selangor hari ini melancarkan Gudang Makanan Selangor (GMS) yang terletak di Pelabuhan Klang
Seterusnya
1 / 610
NASIONAL
The Edge: Over 20% of Malaysian children fully vaccinated against COVID-19 as of April 25
As for the adult population, a total of 16,014,864 individuals or 68.1% had received the booster dose, while 22,964,800 individuals or 97.6% had completed both doses and 23,241,481 individuals or 98.8% had received at least one dose of the vaccine.
The Sun Daily: Toll-free rides, toll discounts up to 50% for Aidilfitri
Apart from that, toll discount of between 30 and 50 per cent will also be given for all classes of vehicles on other highways during the same time and days.
Malay Mail: 520 PLUSRonda teams to patrol highway during Aidilfitri season- PLUS
“We also realise the impact such vehicles will have on the smooth flow of traffic along the affected routes."
The Edge: Over 1.4 million children in Malaysia given COVID-19 vaccine as of April 16
On Saturday, 79,398 doses of vaccine were administered, comprising 59,818 doses for second shot, 4,456 booster jabs, and 15,124 doses for first shot, bringing to 69,570,045 the cumulative number of doses given out under the National Covid-19 Immunisation Programme.
Malay Mail: Selangor to get priority for 5G network upgrade, says minister
“Under the National Digital Network (Jendela) plan, there are three ongoing programmes, firstly to increase the number of new 4G telecommunication towers while for the upgrade to 5G the state of Selangor will be given priority,” he said.
Astro Awani: Selangor akan didahulukan bagi naik taraf rangkaian 5G - Annuar Musa
Katanya di bawah program JENDELA, Selangor menerima peruntukan yang tinggi iaitu sebanyak RM5.34 bilion, untuk menaik taraf sistem telekomunikasi di negeri itu.
Berita Harian: Eksport Malaysia melonjak kepada RM102.3 bilion
Eksport lebih tinggi direkodkan bagi kebanyakan negeri iaitu Pulau Pinang (RM5.7 bilion), Sarawak (RM3 bilion), Kedah (RM2.2 bilion), Wilayah Persekutuan Labuan (RM1.6 bilion), Selangor (RM1.5 bilion),
Sebelum
Seterusnya
DALAM BERITA
Selangor Journal: Illegal factories: State govt all ears, wants to hear suggestions, says exco
The town hall session, held at the Shah Alam City Council Convention Centre, was attended by over 1,000 illegal factory operators and owners operating in the state capital.
Astro Awani: Sistem e-Tanah diperluas ke Selangor
Kelebihan sistem berkenaan juga adalah Kaunter "Single Point of Contact" (SPOC) yang membolehkan semua urusan tanah dilaksanakan pada satu kaunter sahaja berbanding selama ini yang memerlukan orang awam pergi ke banyak kaunter yang berlainan untuk menyelesaikan urusan mereka.
Sebelum
Seterusnya
LAIN-LAIN
Astro Awani: DUN Selangor lulus usul kecam keganasan terhadap atlet, gesa siasatan menyeluruh
Beliau berkata tindakan ekstrem itu boleh membantutkan usaha negeri melahirkan lebih ramai atlet yang berwibawa di Malaysia.
NST: 65 pct of high impact projects under Selangor First Plan in implementation stage
Estimated to be fully completed by 2029, construction of the KSSA project is divided into three phases, with phase one involving the building of a new main stadium, an outdoor sports area, a parking plaza, and an integrated transportation terminal.
Malay Mail: Selangor FC Solidarity Fund raises over RM70,000 to cover MFL fine
Amirudin also thanked all contributors, particularly football fans and state assemblymen, for their generosity in donating to the Red Giants.
Sebelum
Seterusnya
#KITASELANGOR
Daftar hari ini untuk dapatkan maklumat terkini terus ke e-mel anda
Nama
Alamat Email
Terima kasih!
Anda telah didaftarkan untuk menerima makluman dan maklumat terkini.
Maaf! Ada ralat.